Project Name : SECOND AND THIRD STAGE OF INCREASING THE RELIABILITY OF POWER SUPPLY TO THE CITY OF ASHGABAT

Project/Contract Title and Brief Description of Work : KÖŞGİ 35/10 Kv S/S ORBİTA 110/35/10 Kv S/S 2 PC. TP INSTALLATION

Work Location Country : Turkmenistan

Work Location City : Ashgabat

Voltage (kV) : 10/0.4

Bay Quantity :
-

Total Transformer Capacity (MVA) : -

Signing Date : 01.11.2015

Date of Provisional Acceptance : 30.03.2016